Complex delivery of a cooling circuit. Construction of a CC8 cooling centre for a PC4, ‘SN EDISON – TPP REV AMP’ turn key project. The cooling circuit includes: 1/ 3 units of CTF 325 model cooling towers 2/ pumping station 3/ filtration unit 4/ chemical water treatment station 5/ the structural section 6/ wiring 7/ measurement and regulation including the control system.