This involves the supply of dry coolers for a new power station in Kalingrad Oblast in Russia, TEC Pregolskaya. We are supplying two cooling towers – the air coolers which are part of the main cooling circuits, and auxiliary cooling circuits, with total output of 4x 110 MW. As part of the EPC project, we are securing the draft solution, design, production of steel structures, production of piping bundles, pressure pumps, collection reservoirs and other components. The delivery also includes assembly supervision, commissioning, testing and analyses.