The implementation of the power plant in India is going well

Our company is currently conducting one of the most important foreign orders in India. It’s participating in the construction of the Meja Thermal Power Plant, which has a capacity of 2x 660 MW, specifically in the construction of concrete-design forced-draft cooling towers.

The project includes designing two blocks (4 cooling towers in total), project documentation processing, components production, assembly and installation, testing and analysis, commissioning, and subsequent warranty service. It is a very demanding job in terms of expertise, financing, deadlines, distance and climatic conditions.
Despite all the obstacles that were faced during the implementation, we are pleased to inform you that we have successfully completed the first of the blocks and have handed it over to the customer for the planned trial operation. In September 2017 the construction of the second block will be completed. The trial operation, during which we will test the tower’s guaranteed performance, is scheduled for 2018.
We always strive for quality, expertise and a professional attitude throughout an implementation. Whether the contact is in the Czech Republic, Europe or Asia. We have been intensively engaged in industrial cooling for more than 25 years, and we are among the leaders in this field. Our professionalism with a personal touch has been proved in India.
Below, you can see the "Facility Completion Certificate for the MEJA Project", in which the customer expresses their satisfaction with our services and products provided within the project.
If you also turn to us with your implementation, we will do our very best to satisfy your requirements. For more information on our projects, please visit our REFERENCE section or contact our sales department.
We look forward to collaborating with you.