Complete delivery of 80-m high steel industrial chimney to PGE Kielce heat power plant. The project included: preparation of project documentation, obtaining necessary administrative permits for construction, manufacturing, final assembly, preparation of the base for installation, installation on-site, connections and securing of the structure according to the design specifications, putting into operation.